Shepherd’s Bush Housing: Office Refurbishment

Client: Shepherd’s Bush Housing

Location:  Craft Court, Hammersmith, London

Size:  3,000 sq ft

Value:  £268,000

 

For your convenience, you can download this case study here – SBHG2 Housing Case Study

 

Craft Court in Hammersmith is a unique building constructed in 1976 for Shepherds Bush Housing Community Hub (SBHG).

The office property required significant investment and substantial office refurbishment works to transform the property into a modern, sustainable environment that reflected the group’s high level of services within the local Hammersmith community.

Rapport Solutions were appointed to manage the design development and contract tender process procured under a two-stage tender, providing SBHG cost transparency and control over expenditure.

Works included:

  • Complete strip back to base build
  • Replacement of HVAC system
  • Replacement entrance doors and exterior refurbishment
  • Replacement toilets & wash rooms
  • Breakout facilities to support the Training Hub
  • Refurbishment and fit out throughout the building

The ultimate design has created a multifunctional space that flows naturally without feeling disjointed across three-floor levels.  Working with the building architecture the design utilises space, form, colour, light and graphics to create a state of the art working environment.

Rapport Solutions provided the following services:

  • Project Management
  • Design Consultancy
  • Cost Consultancy
  • Tender Management
  • Employer’s Agent
  • Furniture Procurement
  •  

Design Consultant: Integrated Workplace Solutions

We continue to support SBHG’s growth and development providing reactive Churn Management services for both the Chiswick and Hammersmith offices.